Case Studies
 
			 
								Civic Center Plaza – Commercial Lining
											
											01/17/2025
										
										
											
											Bill Howe
										
									
										Rehabilitate 1,220 feet of storm and overflow drains at the Civic Center Plaza Building. The project minimized tenant operational disruptions while ensuring the drainage system's efficiency and longevity through strategic access and precision lining processes.									
									Read More
								 
								Newbreak Church – Commercial Lining
											
											12/11/2024
										
										
											
											Bill Howe
										
									
										Project Overview Challenge: Restoring heavily degraded sewer lines at a commercial property without interrupting business operations and maintaining the structural integrity of the property’s plumbing system. Solution: Commercial Epoxy Pipe Lining: Implemented advanced Cured In Place Pipe (CIPP) technology to rehabilitate up to 470 linear feet of 3″ & 4″ sewer pipes, ensuring minimal disruption […]									
									Read More
								 
								SRM Investments – Commercial Plumbing
											
											04/10/2024
										
										
											
											Bill Howe
										
									
										Project Overview Bill Howe upgraded the hot water system in an apartment complex with minimal disruption, completing the project in 5-6 weeks with a 10-year warranty, ensuring safety and efficiency. Challenge: Replace all hot water lines in a two-building apartment complex. Perform work with a strong emphasis on not disrupting residents. Solution: Replaced main and […]									
									Read More
								 
								FDC Management – Commercial Plumbing
											
											03/21/2024
										
										
											
											Bill Howe
										
									
										Project Overview Bill Howe Plumbing (BHP) undertook a substantial project to reroute hot and cold water lines for a 36-unit apartment complex, divided into two buildings. The project aimed at enhancing the efficiency and reliability of the water supply system, ensuring long-term sustainability and compliance with current standards. Challenge: The apartment complex faced significant issues […]									
									Read More
								 
								California State University San Marcos – Commercial Lining
											
											03/21/2024
										
										
											
											Bill Howe
										
									
										Project Overview Challenge: Rehabilitate existing 250 linear feet of aging chilled water lines installed behind structural members and other utility lines within difficult-to-reach and inaccessible spaces in the Art Building. Solution: Utilize NuFlow NuLine epoxy barrier coating technology to efficiently restore pipe functionality, ensuring the chilled water system’s effectiveness with minimal structural impact. Location: San […]									
									Read More
								 
								Bartell Hotels – Commercial Plumbing
											
											07/19/2023
										
										
											
											Bill Howe
										
									
										Remove the aging and broken 900 gallon storage tank, replace it with an up-to-date efficient, robust water storage system capable of handling heavy demand for a hotel and music venue. Create an outlet solution that accommodates a low ceiling height.									
									Read More
								 
								The Salk Institute – Commercial Lining
											
											07/19/2023
										
										
											
											Bill Howe
										
									
										Rehabilitate an aging underground sewer main without causing any disruption to the prestigious campus or damaging its architecture.									
									Read More
								 
								California State Office Building – Commercial Lining, Government
											
											07/18/2023
										
										
											
											Bill Howe
										
									
										Restore the building’s failing rain leaders without damaging the building or disrupting operations.									
									Read More
								